Science & Technology

Kalpakkam fast breeder reactor attains criticality: why this is a ‘defining step’ in India’s 3-stage n-programme

2 min readRead original on Indian Express
Prelims: Science & Technology, GeographyMains: GS 1, GS 3

Context

India’s first indigenous 500 MWe Fast Breeder Reactor (FBR) at Kalpakkam attained criticality, a crucial milestone marking a self-sustaining nuclear fission reaction. This achievement validates the second stage of India's three-stage nuclear power program, paving the way for commercial power generation and establishing the technological link needed to eventually utilize India’s vast thorium reserves.

Exam perspectives

The SSC GK capsule for this story has not been prepared yet.
Takes about a minute. Fact-checked against official sources and saved — instant for everyone after you.

Key references

AI-generated study notes, sourced from Indian Express. Verify facts and figures with standard sources.

350+
mock exams
1,16,928
tests completed
23,82,523
questions answered